Feature walkthroughsInventory

Turn confirmed page counts into a transparent budget.

Use confirmed inventory pages to explore remediation budgets with editable rates, duplicate handling and visible limits instead of a guaranteed quote.

Worked exampleIllustrative data

A chosen 200-page scope at hypothetical $4 and $12 rates gives a planning range before contingency.

Illustrative budget, not a quotation
Input or resultValueInterpretation
Confirmed pages selected200Your proposed scope
Editable rates$4–$12 / pageIllustrative assumptions
Base budget$800–$2,400Pages multiplied by rates
Unknown pagesExcludedAdditional scope may exist

Scroll sideways to see all columns. Use arrow keys when the table is focused.

At a glance

The inventory’s budget planner multiplies a chosen confirmed-page scope by editable USD rates. It does not prove that those pages require remediation, price unseen pages or issue a quote. Decide which sources still need to be published and reviewed before using the full inventory as a work estimate.

Select work before assigning a rate

An inventory measures a collection, not a remediation obligation. Some files are obsolete, already usable or better replaced at the source. Others are essential forms or notices that deserve early review regardless of length.

Choose confirmed unique pages if the same byte-identical source will be handled once. Choose a URL-based footprint only if your plan truly requires separate work for every publication. Document the assumption, then list excluded and unknown files beside the scope rather than burying them in a contingency percentage.

  1. Review document use, owner and current version.
  2. Select a confirmed page scope with a clear duplicate rule.
  3. Enter rates from your intended supplier or your own scenario.
  4. Review complex work, fixed fees and unknown scope separately.

Published prices are examples, not a market average

The report planner can provide dated published service examples as a starting band, with its sources and date visible. A small set of vendor prices is not a traditional-market average or an upper bound. Forms, mathematical content, drawings, signatures, source quality and acceptance requirements can change a real quotation.

Our free cost calculator uses explicitly illustrative, editable defaults. Enter your own low and high assumptions and any contingency you want to test. The calculator makes the arithmetic inspectable; it cannot decide whether a supplier’s scope or acceptance process meets your needs.

Keep the estimate tied to evidence

Record the inventory date, confirmed page basis, unresolved discovery gaps and the source of your rates. Show a lower and upper scenario instead of presenting one precise number as a finished procurement estimate.

For a decision that commits funds, ask suppliers to examine representative documents and define deliverables, review coverage and correction responsibilities. Sampled PDF profiles can inform that conversation, but they should not silently set prices or stand in for a document review.

Budget assumptions to retain
AssumptionWhy it matters
Unique or URL pagesAvoid repeated source work
Current in-scope documentsSeparate inventory from actual work
Rate and evidence dateMake the scenario reproducible
Uncounted and unseen scopeKeep additional work visible

Scroll sideways to see all columns. Use arrow keys when the table is focused.

Sources and scope

Methods, worksheets and illustrative examples are DocAccessible editorial contributions. These references support the technical or product details described above. W3C techniques are informative guidance; they are not a certification scheme.

  1. DocAccessible PDF inventory

    The counting workflow, report options and purchase boundary.

  2. DocAccessible remediation options

    The different output paths and their review requirements.

Written by the DocAccessible team under our editorial policy. Suggest a correction if a source or product detail needs updating.

See the evidence in a working example

Explore the public sample inventory report to try its table, full-screen view and missing-count reasons. The downloadable counting fixture check records what the local counter returned for seven self-authored inputs, with hashes and explicit limits.

Put the method to work.

Start with a clearer picture of your PDFs.

Build a count-based planning report